mobileads.

Instrument 01 · client-side, ungated

Incrementality test calculator

Before a holdout test launches, arithmetic decides whether it can succeed. Enter your baseline conversion rate, the smallest lift worth acting on, and your weekly traffic; the instrument returns the sample each arm needs and how many weeks that takes at your volume. Most tests that "failed" were lost right here, before day one.

Install → the event you care about (payer, trial, D7 return).

The smallest lift you would change budget over. Smaller lifts need far more data.

Users required per arm

36,691

Weeks until the test can read

9.2 wk

You are testing

2.00% vs 2.30% · 95% confidence · 80% power

Runnable, but long. Consider a larger holdout or a bigger minimum lift.

Two-proportion z-test, equal-size arms assumed for the per-arm figure; the weeks figure accounts for your holdout split. Runs in your browser; nothing is sent anywhere.

How to read the result

The per-arm figure is the number of users each group needs before a two-proportion test can distinguish your baseline from your lifted rate at 95% confidence with 80% power. The weeks figure divides that requirement by your weekly traffic, split by your holdout share; the smaller arm always finishes last, which is why a 10% holdout takes so much longer than a 30% one on the same traffic. For orientation: detecting a 15% relative lift on a 2% baseline needs roughly 36,700 users per arm. Halving the detectable lift roughly quadruples the requirement, which is the brutal arithmetic behind our advice to test differences big enough to change budgets.

The design discipline around the number, pre-registered decision rules, matched geos, and reading results as intervals, is covered in practice 03 and worked through on a real account in the subscription write-up, where the holdout contradicted a dashboard by a factor of two.

Q

Questions about the instrument

Why are 95% confidence and 80% power fixed?
Because they are the settings we actually run client tests at, and letting them float invites shopping for a smaller sample. 95%/80% is the standard pairing in controlled experiments; if your organization runs at 90% confidence, your required samples shrink and this calculator's answer becomes conservative for you, which is the safe direction to be wrong in.
What should I enter as the baseline conversion rate?
The conversion rate of the population entering the test, from install or from eligibility to the event you would move budget over: payer rate, trial-start rate, or D7 return rate. Pull it from your MMP cohort report for the exact audience and window the test will use, not the account-wide average.
The calculator says my test needs six months. Now what?
Three honest options: raise the minimum detectable lift (test for a difference big enough to matter commercially, not statistically), enlarge the eligible population by widening geos or pooling similar campaigns, or accept the channel's lift as unknowable at your volume and size its budget by the cheaper layers described in Note 04. Running the underpowered test anyway is the one option that costs money and returns nothing.